Contact: GDC 2011-13-16 AWT Nobles Hill Realignment
Client: Grey District Council
Contract Period: November – December 2012
Description: The vertical and horizontal realignment, pavement rehabilitation, construction and associated works of approximately 550 metres on the Atarau Road, 27km from Greymouth. Site works included cut to waste, supply and placement of rock/bulk fill gravel and pavement aggregate (AP65 and M/4) followed by chip sealing and road marking.
Contract: NZTA 63033 SH6 Woodpecker Bay Rock Protection 2012
Client: New Zealand Transport Agency
Contract Period: August – September 2012
Description: Supply and cart rock and rubble to site at Woodpecker Bay to construct new rock protection of approximately 120m in length to prevent further coastal erosion damage.
Contract: WFPP C2011/E5 Left Bank Chainage 13.85 to 14.74 Harrs Road/Eyre Diversion to Groyne 56
Client: Environment Canterbury
Contract Period: June – October 2012
Description: This contract is part of the Waimakariri Flood Protection Projects (WFPP) and involves the extraction of rock and disposal of overburden from Environment Canterbury’s View Hill Quarry, rock grading, transport and placement of rock protection on the left bank of the Waimakariri River between the Eyre Diversion and Groyne 56 including improvements to the head of Groyne 56.
Contract: GDC 2011-12-05 Area Wide Treatment Fulfords to Fords Creek
Client: Grey District Council
Contract Period: June – October 2012
Description: This contract is for an area wide pavement treatment on the Taylorville-Blackball Road over a distance of 1.8km and involves culvert replacement, cut ot waste, bulk fill, the construction of a 3.5m wide 100m long slow vehicle lane, construction of pavement layers, two coat chip sealing, pavement markings and the construction of a 25m long x 3m high retaining wall.
Contract: 2011/E6 WFPP Coutts Island Ring Bank
Client: Environment Canterbury
Contract Period: April – June 2012
Description: The work involves raising and upgrading an existing stopbank on a horseshoe loop on Coutts Island between the two access roads and associated works which include removal and disposal of trees off site, stripping and stockpiling of topsoil, supply and placement of approx. 14,000m3 of river run gravels, culvert extensions, farm accessways, fencing, topsoiling and regrassing.
Contract: NZTA 62299 Dudleys to Totara Flat AWT
Client: New Zealand Transport Agency
Contract Period: February – April 2012
Description: This contract is for an Area Wide Treatment and associated works of 1.52km of State Highway 7 at Totara Flat. The work involves culvert extension, cut to waste, backfilling, milling of existing surface, construction of pavement layers, two coat chip sealing ans pavement markings.
Contract: GDC 2011-12-20 Area Wide Treatment Taramakau Settlement Road
Client: Grey District Council
Contract Period: January – March 2012
Description: This contract is for an Area Wide Treatment on Taramakau Settlement Road over a distance of 1.1km in two sections and involves culvert replacement, cut to waste, bulkfill, construction of pavement layers, two coat chip seal and pavement marking.
Contract: GDC 2011-12-19 Area Wide Pavement Treatment Ruby Creek to Bray Creek
Client: Grey District Council
Contract Period: December 2011 – February 2012
Description: The contract is for an Area Wide Treatment over 1.1km of the Taylorville – Blackball Road and involves culvert extension/replacement, cut to waste, bulkfill, construction of pavement layers, two coat chip sealing and pavement markings.
Contract: NZTA 62308 Turiwhate to McGraths Area Wide Treatment
Client: New Zealand Transport Agency
Contract Period: December 2011 – April 2012
Description: The work is for an Area Wide Treatment over 1.46km of State Highway 73 at Turiwhate and involves culvert extension/replacement, cut to waste, bulkfill, milling the existing surface, construction of pavement layers, two coat chip sealing and pavement markings.
Contract: WFPP C2011/E2State Highway 1 & Otukaikino and C2011/E3 Main North & Rail Bridges
Client: Environment Canterbury
Contract Period: September 2011 – April 2012
Description: The work involves rock extraction, grading and transporting from the View Hill Quarry, Oxford for placement of rock protection around the State Highway One, Main North Road and Rail right bank bridge abutments.