Engelbrechts

Contract: WFPP Contract 2012/E3 RB Ch 10.86 to 13.27 Engelbrechts

Client: Environment Canterbury

Contract Period: February – May 2013

Description: This contract is part of the Waimakariri Flood Protection Project and involves raising and upgrading an existing primary stopbank on the right hand bank between Ch. 10.86 and 13.27km – Engelbrechts. It includes the removal and disposal of trees off site, stripping and stockpiling topsoil, supply and placement of approximately 20,000m3 of river run gravels, culvert extensions, farm accessways, fencing, top-soiling and regrassing.