Contract: R2015/5 Drilling, Blasting, Stockpiling and De-Rubbling of West Coast Regional Council Quarries
Client: West Coast Regional Council
Contract Period: 3 years from July 2015
Description: This contact is for the operation of four nominated West Coast Regional Council quarries with the specific purpose of producing Armour-Grade protection rock. Work includes drilling and blasting as and when required, stockpiling rock and rubble, managing quarry waste and maintaining available rock stockpiles at each quarry.
Contract: C2014/E6 Kaiapoi River Stopbank Buttressing
Client: Environment Canterbury
Contract Period: June – August 2015
Description: This contract is for the supply and placement of approximately 5,725 m3 of compacted gravels to construct and form a buttress over 975m on the existing Kaiapoi River Stopbank near its confluence with the Waimakariri River. Works also included the installation of a new headwall, extension of a culvert and the extension of an open drain through the new buttress. The completed buttress is topsoiled and hydroseeded.
Contract: GDC 2013-14-08 Westland Recreation Centre Earthworks
Client: Grey District Council
Contract Period: January – February 2015
Description: This contract is to remove approximately 5,000m3 of unsuitable soil and other material to a maximum depth of 4.5 metres and supply, place and compact bulk and graded fill to foundation level. The site includes material from an old refuse tip which will be disposed of at a specially built lined pit at the McLeans Landfill. It is estimated there will be approximately 3500m3 disposed of at this site and the remaining 1500m3 will be removed to the permitted Coal Creek Pit.
Contract: GDC 2013-14-14 Nelson Creek Road Area Wide Pavement Treatment
Client: Grey District Council
Contract Period: May – October 2014
Description: This contract required for 150mm granular overlay, pavement rehabilitation, construction and associated works of approximately 2800m on the Nelson Creek Road. Site works include 6100m3 excavation and disposal of cut to waste materials, supply and placement of 6550m3 river run gravel as bulkfill material. Supply of AP65 and M/4 pavement aggregate, replacement and extension of existing culverts, installation of 2 precast culvert headwalls, construction of 300m of new water table followed by first coat sealing and road marking.
Contract: NZTA 11181 Stoneyhurst Sawmill Reconfiguration – Earthworks
Client: New Zealand Transport Agency
Contract Period: March – May 2014
Description: This contract is to develop a new log storage area for the Stoneyhurst Sawmill across the drain from their current location. The work involved tree and stump removal, installation of culverts, bulk earthworks and metal course construction for the new storage area and landscaping including fencing.
Contract: WFPP 2013/E1 2013-2015 Physical Works Programme
Client: Environment Canterbury
Contract Period: November 2013 – May 2015
Description: This contract has 5 Separable Portions of work to be completed which include the operation and management of Environment Canterbury Regional Council’s View Hill Quarry including the extraction, sorting, grading and stockpiling of 94,900 tonnes of rock. It also involves the loading, weighing, transport and placement of this rock to form the required river protection associated with the 2013-2015 capital and maintenance works as part of the Waimakariri Flood Protection Project.
Contract: 2013-14-06 Cycle Trail Construction Stage Five – New River to Taramakau
Client: Grey District Council
Contract Period: October – November 2013
Description: The work involves extending the Cycle Trail by approximately 2200 metres from the southern end of New River Bridge to within 50 metres of the northern end of the Taramakau River Bridge.
Contract: WFPP Contract 2012/E3 RB Ch 10.86 to 13.27 Engelbrechts
Client: Environment Canterbury
Contract Period: February – May 2013
Description: This contract is part of the Waimakariri Flood Protection Project and involves raising and upgrading an existing primary stopbank on the right hand bank between Ch. 10.86 and 13.27km – Engelbrechts. It includes the removal and disposal of trees off site, stripping and stockpiling topsoil, supply and placement of approximately 20,000m3 of river run gravels, culvert extensions, farm accessways, fencing, top-soiling and regrassing.
Contract: WFPP Contract 2012/E2 Left Bank Chainages 4.83 – 5.63 Left Bank Rock Lining
Client: Environment Canterbury
Contact Period: February – April 2013
Description: This contract involves the placement of approximately 18,000 tonnes of graded rock. The work includes extracting and grading of rock from the Council’s View Hill Quarry near Oxford, the transport and placement of this rock, along with associated earthworks and reinstatements to increase the level of flood protection immediately above, below and in between the State Highway One Motorway Bridge and Main North Road and Rail Bridges on the left bank of the Waimakariri River.
Contract: GDC 2012-13-23 Cycle Trail Construction Contract – Stage Four Paroa to New River
Client: Grey District Council
Contract Period: January – March 2013
Description: The work involves extending the Cycle Trail by approximately 4000 metres from the northern end of Saltwater Creek Bridge (Paroa) to the northern end of the New River Bridge (Camerons area) on the western side of State Highway 6.